[an error occurred while processing this directive]

question for heatpro


[ Follow Ups ] [ Post Followup ] [ Boiler Room Residential and Home Forum #3 ] [ FAQ ]

Posted by joe on May 16, 2006 at 09:28:43:

http://www.energymanagertraining.com/equipment_all/boiler/boiler_dos.htm

last sentence of paragraph 2 ("Do #2"):
"Install a swing check valve on the return side of each zone to block the return side. The latter is necessary because buoyancy forces try to establish two-way flow in the return pipe. "


Does this apply to the European 2 pipe circuit installation?


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:


[ Follow Ups ] [ Post Followup ] [ Boiler Room Residential and Home Forum #3 ] [ FAQ ]