I wish to obtain a suitable engineering related position in the power-plant engineering or related industry commensurate with my current level of education, experience and expertise.


[ Follow Ups ] [ Post Followup ] [ Resume Board Main Page ] [ FAQ ]

Posted by Theodore Janssen on June 05, 2013 at 04:50:13:

Curriculum Vitae
Theo Janssen
Sr. Process / I&C Commissioning Engineer / Supervisor / Manager
Erection / Refurbishment Supervisor
Boiler / HRSG Inspector

In the main field of:
• Power Plants
• Incinerator Plants
• Environmental Installations


Personal Information:

Name : Janssen, Theodores H.J.
Address :
Zip code and Place :
Country : The Netherlands
Tel :
Mobile Tel :
Mobile Tel (Taiwan) : 911493919
Email : theodorejanssen.nl@gmail.com
Date and Place of Birth : 26 April 1967, Nijmegen
Marital Status : Married
Gender : Male
Nationality : Dutch

Education:

1973 - 1979 6 Classes.

1979 - 1983 Electrical Technician.

1983 - 1984 Electronic Technician.

1984 - 1988 Maritime Engineering School (General Operational Engineering).
• First Aid.
• Fuels, Lubrications and Materials.
• Technical English for Engineer Officers.
• Machine, Piping and Process Drawings.
• Practical Work:
- Machinist and Construction.
- Welding (Electrical, CO2, Etc.).
• A.O.T. (General Operational Engineering):
- Steam Boilers.
- Steam Turbines and Machines.
- Gas Turbines.
- Air Conditioning Installations.
- Pneumatic- and Hydraulic Installations.
- Freezing and Cooling Installations.
- Drinking Water Installations.
- Waste Water Treatment Installations.
• Combustion Engines.
• Utilities, Pumps, Valves, Etc.
• Chemical Engineering.
• Technical Physics.
• Electrical Engineering.
• Measurement and Control Engineering.


Other Certificates:

Flange Inspector for Chemical and Process Installations, Certificate No.: F. 02627.
Safety Passport for Chemical- and Process Industries, and Power Plants
[Onshore / Offshore], Certificate No.: E134030.
VCA/SCC No. : 9644558/1/NL/819539
First Aid

Seminars and Training’s:

Fire Fighting in Chemical and Process Installations [Onshore / Offshore].
First Aid.
Instrument and control systems in power plants.
Emission measurements at power plants.
Erosion and corrosion in steam generator systems.
Power management in power plants.
Feed water treatment and boiler water chemistry.
Visual / stroboscopic inspections and ultrasonic wall-thickness measurements on pressure-parts.


Languishes:

Dutch, Native.
English / Technical English, Perfect.
German / Technical German, Perfect


Military Education:

1989 - 1990 Military School SROKI (school for infantry officers), Ermelo The Netherlands.


Driver License:

B. E. (Clean License)


Professional Experience:

1 Year Taiwan
Worked as local representative in Taiwan for a Dutch boiler manufacturer.

Main projects, responsibilities and tasks:
Analyze the market in order to identify new growth opportunities.
Attending to inquiries from clients, updating and answering client concerns.
Representing the company in meetings held locally and reports and updates to the main office.
Administration and efficient daily operation of a full service branch office, including operations, product sales, customer service.
Supervising removal and installation of new pressure parts on a CO waste heat boiler.
Root-cause analyses, inspection and repair of boiler and boiler tube failures.
Engineering & consultancy services


3 Years The Netherlands / Worldwide
Worked at the Consultancy & Engineering department of a Dutch boiler manufacturer. Mainly responsible for worldwide services as Service Specialist in the field of HRSG / Boiler Inspector, Erection / Commissioning Supervisor and Commissioning Troubleshoot Engineer.

Main projects, responsibilities and tasks:
Two horizontal once through HRSG's pilot plants with wet steam generation for oil recovery.
Repair and modification of the steam and condensate system.
Preparation, executing and acceptance of SAT (site exception tests) for DCS and BMS.

Two vertical single pressure heat recovery steam generators.
Supervising installation of additional pre-heaters by local contractor.
Recommissioning of water steam cycle.

Three oil fired EDL boilers
Inspection and reporting of present boiler status.
Preparation of a refurbishment plan.
Engineering / updating of existing control and safety logics to fulfill regulations.
Preparation of demolishing and cleaning plan.

Two oil and gas fired EDL boilers
Project team regarding refurbishment of two ELD boilers with Low-Nox burners and flue gas recirculation system.

One gas fired EDL boiler
Preparation of steam blowout procedure.
Supervising and acceptance of steam blowout.

Worldwide inspections and services of heat recovery steam generators.
Visual, boroscopic and ultrasonic inspections of HRSG's. and pressure-parts.
Publishing of inspection reports.
Issuing repair and/or modification procedures.
Tuning and/or optimizing water steam cycle.
Creating maintenance and inspection plans.


18 Months Sweden
One vertical triple pressure heat recovery steam generator for a 440MW of electricity and 250MW of heat CHP plant including SCR system.

Commissioning TFA
HRSG Modification Supervisor

Mainly responsible for:
Commissioning and modification of the HRSG.
Supervising up to 45 welders, fitters and riggers in two shifts to modify the HRSG within the time-frame and budget.
Meet and report daily with consortium commissioning manager to communicate the commissioning status, resolving problems, and to coordinating activities.


1 Month The Netherlands
One municipal waste incinerator

Commissioning Manager / Engineer (Temporary Replacement)

Mainly responsible for:
Supervising commissioning engineers.
Meet and report daily with client to communicate the commissioning status, resolving problems, and to coordinating activities and to ensure an orderly transition from erection to commissioning up to receipt of PAC.


9 Months Germany
One biomass incinerator plant including district heating, steam turbine and utility systems.

Commissioning Manager on Client Site (Client was Main Contractor)

Mainly responsible for:
Resolving conflicts with different parties / contractors as they arise and reporting and / or resolving technical problems immediately.
Serving as primary representative for all commissioning activities.
Implementing and monitoring site safety, environmental, quality and schedule programs for all employees and scope of commissioning supply.


2 Months Egypt
Two horizontal triple pressure heat recovery steam generators including water / steam system.

Commissioning Advisor

Mainly responsible for:
The chemical cleaning and steam blowout.


1 Month Spain
Two horizontal triple pressure heat recovery steam generators including water/steam system.

Commissioning TFA
Boiler Repair / Modification Supervisor

Mainly responsible for:
Repair, modifications and re-commissioning of two HRSG's


5 Months United Arabic Emirates
Four single pressure heat recovery steam generators for desalination plants.

Commissioning Manager

Mainly responsible for:
Supervising commissioning engineers.
Meet and report daily with client to communicate the commissioning status, resolving problems, and to coordinating activities and to ensure an orderly transition from erection to commissioning up to receipt of PAC.
Reporting on plant and equipment commissioning status on a regular basis to the project manager.
Chemical cleaning and steam blowout.


2 Weeks Spain
One biomass incinerator plant.

Commissioning / Tuning Engineer

Mainly responsible for:
Optimizing and tuning of the burning process and flue gas cleaning plant to achieve the emission requirements of the Spanish government.


2 Month China
Two flue gas desulphurization (FGD) plants and one waste water treatment plant including utility systems for a 400 MW coal fired power plant.

Commissioning TA (Technical Advisor) for Client

Mainly responsible for::
Inspection and acceptance of the delivery scope.
Installation and commissioning supervisor of delivery scope.


4 Years Germany / France
Two vertical heat recovery steam generators with additional firing and flying takeover.

Commissioning Management Team (Germany Contractor / Main Office)
Deputy Commissioning Manager / Process - I&C Commissioning Lead Engineer

Mainly responsible for:
Preparation of the commissioning procedures, commissioning time schedule and planning of required manpower.
Project coordination between site and main office.
Preparation of the training manuals.
Review and modification of the control logics.
Executing and acceptance FAT of DCS and BMS


10 Months Germany
One flue gas desulphurization (FGD) plant and one waste water treatment plant for a 400 MW coal fired power plant.

Process / I&C Commissioning Lead Engineer for German Contractor
Deputy Commissioning Manager

Mainly responsible for:
Commissioning of mechanical equipment.
Optimizing and tuning of the chemical process to achieve the emission requirements and gypsum quality.
Supervising the trail-run and acceptance tests.


1 Months Germany / New Caledonia
One incinerator plant including flue gas cleaning plant, steam turbine and utility systems.

Commissioning / Operation Documentation Engineer for German Contractor

Mainly responsible for:
Preparation of Operation & Maintenance Manual and HAZOP study


2 Months Taiwan
One incinerator plant including flue gas cleaning plant, (semi dry scrubber, bag house filter and denox) steam turbine and utility systems.

Project Management for German Contractor

Mainly responsible for:
Preparation and negotiations of Sub-Contracts with local engineering companies for commissioning and operation services.


3 Months Germany / Isle of Man
One incinerator plant including SNCR injection and utility systems.

Commissioning Management Team for German Contractor

Mainly responsible for:
Analyze and review the Sub-Contract regarding claim risks of commissioning and erection supervisory services.
Preparation of commissioning manual, commissioning time schedule and planning of required manpower.


2 Months Germany / China
Three waste gas cooling systems including steam accumulators and utility systems.

Commissioning Documentation for German Contractor

Mainly responsible for:
Preparation of Operation & Maintenance Manual.
Preparation of Commissioning Documentations


8 Months Saudi Arabia
One water / steam cycle including utility systems for a 360 MW oil fired power plant.

Commissioning Lead Engineer for German Contractor

Mainly responsible for:
Basic engineering, implementing, tuning and testing control logic’s and function groups.
Commissioning of steam bypass, condensate, feed-water and water treatment / sampling systems.


2 Months Germany
One incinerator pilot plant including flue gas cleaning plant (bag hous filter and scrubber), steam turbine and utility systems.


Commissioning and Tuning Engineer for German Contractor

Mainly responsible for:
Optimizing and tuning of the burning process to achieve the emission requirements of the German Government.

4 Years Taiwan
Four flue gas desulphurization plants and one waste water treatment plant including utility systems for 550 MW coal fired power plants.

Commissioning TA (Technical Advisor) for Client
Deputy Commissioning Manager

Mainly responsible for:
Commissioning of mechanical equipment.
Optimizing and tuning of the chemical process to achieve the emission requirements and gypsum quality.
Supervising the trail-run and acceptance tests.


7 Months Poland
Four flue gas desulphurization plants and one waste water treatment plant including utility systems for 500 MW coal fired power plants.

Commissioning Shift Leader for German Contractor

Mainly responsible for:
Meet and report on a daily basis to the consortium commissioning manager regarding plant commissioning status and managing and directing activities of commissioning field personal.


2 Years The Netherlands
One incinerator plant including flue gas cleaning plant, (electrostatic precipitator, SO2 scrubber, HCL scrubber, active coal filter and denox) Steam turbine and utility systems.

Responsible Commissioning Manager for Client

Main responsibilities and tasks:
Reviewing the contract schedule requirements to complete the project on time within the assigned budget.
Regularly meetings with the consortium management to ensure proper contract execution.
Resolving conflicts with different parties as they arise and reporting and or resolving technical problems immediately.
Monitoring and reporting on plant and equipment performance on a regular basis to the project manager.
Approval project related documentation.
Meet and report regularly with consortium commissioning manager to communicate the plant commissioning status, resolving problems, and to coordinating activities and to ensure an orderly transition from erection to commissioning up to receipt of PAC.
Serving as primary representative for all commissioning activities.
Implementing and monitoring site safety, environmental, quality and schedule programs for all employees and scope of commissioning supply.


2 Year The Netherlands
Six incinerator plant including flue gas cleaning plant, (electrostatic precipitator, SO2 scrubber, HCL scrubber, active coal filter and denox) Three Steam turbine and utility systems.

Process Operator Control Room


2 Year The Netherlands
Four incinerator plant including electrostatic precipitator, Two steam turbine and utility systems.

Process Field Operator



Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

BEFORE YOU REPLY - THIS BOARD IS NOT TO BE USED TO POST YOUR INTEREST IN A POSITION - ANY POSTINGS OF THIS TYPE WILL BE REMOVED. IF YOU ARE INTERESTED IN A JOB CONTACT THE COMPANY DIRECTLY. THE REPLY IS FOR USE OF THE COMPANY THAT MADE THE ORIGINAL AD ONLY TO POST CORRECTIONS.


[ Follow Ups ] [ Post Followup ] [ Resume Board Main Page ] [ FAQ ]