3rd class boiler Engineer


[ Follow Ups ] [ Post Followup ] [ Resume Board Main Page ] [ FAQ ]

Posted by Ghulam Abbas on May 29, 2009 at 01:02:16:

1996 3rd Class Boiler Engineer

Diploma of Associate Engineer
• Machine design
• Metallurgy
• Drawing
• Mathematics

Senior Mechanical Engineer
• Maintenance and operation of Sugar plant
• Operation of boiling house


Shift Engineer
• Maintenance and operation of Sugar plant
• Operation of boiling house
Maintaining and handling the operation of sugar can crushing capacity 10000 Tons/Day steam generation 240 Tons/Hr at 24kg/cm2 pressure with 8 MW electric generation

Shift foreman/ Assistant Engineer
• Promoted as Assistant Engineer on January 2005
• Responsible for maintenance and operation of a batter of 5 water tube Bagasse fired boilers manufactured by 3 type of boilers manufactured from John Thompson England, I no from Tokoma Japan and 1 no from HMC Taxila having capacity 17Ton/h, 23T/h and 60T/h each.
• Also participated on Erection, commissioning, trial and maintenance of a batter of 2 water tube balanced draft boilers manufactures HMC.
• Also responsible for inspection and despatches of boilers equipment and pressure parts at HMC. Both 2 boilers furnished with Honeywell HC900 control status (Auto and D.C.C)
• Also participated Erection, Commissioning, trial operations and maintenance of New Mills house, Power house and Boiler house, power house both turbine generation capacity 3 MW each manufactured by Perter Brotherhood England
Assistant Foreman.
• Responsible for Erection, commissioning and trial operation of a battery of 2 water tube Bagasse fired with 52%mositure boilers 80 Tins/hour each manufactured by Illefaq Engg LTD, Lahore where the boiler hydraulically tested at 42kg/cm2 and maintained for crushing seasons. Working pressure 24kg/cm2 and working temperature 350C with induced draft fan and forced draft Fan (Balanced draft) having 100 feet length of chimney.
Mechanical supervisor (Boiler House)
• Responsible for operations and maintenance work of a battery of 2 water Bagasse fired with 52% moisture boilers 60 Tons/Hour manufactured by Heavy Mechanical Complex Taxila where the boilers hydraulically tested at 38Kg/cm2 and there working pressure and temp is 24kg/cm2 and 350° C respectively
Mechanical Supervisor
Responsible for Erection, Commissioning, Trial operation of sugar Mills specially two water tube boilers of 60 tons/hour each and boiling house
Mechanical Supervisor
Responsible for Erection, Commissioning, Trial operation of sugar Mills and boiling house
Hands on Experience
• Arc welding
• Gas welding
• Gas cutting
• Fabrication
• Micrometer
• Tube bending operation etc.



Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

BEFORE YOU REPLY - THIS BOARD IS NOT TO BE USED TO POST YOUR INTEREST IN A POSITION - ANY POSTINGS OF THIS TYPE WILL BE REMOVED. IF YOU ARE INTERESTED IN A JOB CONTACT THE COMPANY DIRECTLY. THE REPLY IS FOR USE OF THE COMPANY THAT MADE THE ORIGINAL AD ONLY TO POST CORRECTIONS.


[ Follow Ups ] [ Post Followup ] [ Resume Board Main Page ] [ FAQ ]