Summary of Qualifications
Over 19 years of experience as a boiler technician/stationary engineer. Operated and maintained 600/1200psi
modified D-type water tube main propulsion boilers with integral economizers, superheaters and desuperheaters. Operated and maintained 200/150 MAWP saturated steam water/fire tube boilers. Very proficient in pipe fitting and troubleshooting various electrical boiler controls. I can also read electrical schematics.

Professional Experience

May 2004-Sept. 28, 2006 Cook County Cookers, Chicago, IL Stationary Engineer/Powerhouse Tech
(Plant Closure)
Responsible for the maintenance and operation for, two Trane-Murry, 200 MAWP, 45,000pph water tube boilers.
Perform daily feedwater/boiler chemical analysis. Maintain daily water reports, boiler operating logs and boiler
logbook. Work with and oversaw major repairs performed, by an outside contractor, on both boilers in preparation for annual inspection. Perform refractory repair work on number one boiler. Operated and maintain the wastewater treatment plant. Designed, cut, threaded and install ˝-inch schedule 80 Pipe for heat exchanger. Installed and electrically connected a Grundfos Model CR-5 16-stage centrifugal feedwater pump. Maintained and cleaned cooling
towers for ammonia refrigeration system. Operated and maintained heat exchangers for domestic hot water.

Aug 2003-April 2004 Express Personnel, Valparaiso, IN Temporary Services
Work in various manufacturing positions.

Feb. 2003-July 18, 2003 Rush Presbyterian Laundry, Chicago, IL Stationary Engineer/Maintenance 2
(Plant Closure)
Operated and maintain two CB Kramer one 700hp 19,000pph and one 400hp 14,400pph 150 MAWP fire tube boilers.
Perform daily boiler/feedwater analysis and recorded results on water the test report. Open number two boiler for
annual inspection IAW A.S.M.E. Code and manufacture’s technical manual. Install and hung new safety valve discharge piping. Responsible for the daily start-up of the plant. Perform preventive and corrective maintenance of all laundry equipment. Replace, Sloan Flushometer and piping. Use Sloan replacements kits to repair Sloan Flushometers.

May 2002-Aug. 2002 Global Material Technologies, Chicago, IL Stationary Engineer
Commissioned, operated and maintained two York-Shipley 80hp, 2600pph, 150 MAWP fire tube boilers. Perform daily boiler/feedwater analysis and recorded the results on the water test report. Responsible for all steam and condensate piping. Responsible for maintaining the proper temperature of two 10,000 gallon soap tanks.

Sept. 2001-Dec. 2001 Hospital Laundry Services, Chicago, IL Stationary Engineer/License Mechanic
Responsible for the operation of two CB Kramer 750hp, 25,000pph, 150 MAWP fire tube boilers. Perform daily
boiler/feedwater analysis and recorded results the water report. Perform preventive/corrective maintenance on
industrial steam and gas dryers; including various other pieces of laundry equipment.

April 1999-Sept. 2001 Indeck Power Equipment Co., Wheeling, IL Boiler Technician
Performed electrical and mechanical inspections on York-Shipley 200 MAWP, 5,500pph, 150 MAWP duel fuel trailer mounted fire tube boilers and Nebraska/Volcano 300 to 350 MAWP, 30,000pph-70,000pph duel fuel trailer mounted water tube boilers. Followed the electrical schematic to install a Fireye E100 microprocessor controller into the control panel of 350 MAWP, 36,000pph duel fuel trailer mounted water tube boiler. Designed, cut, threaded and installed new fuel oil piping for a 350 MAWP, 36,000pph duel fuel trailer mounted water tube boiler. Set/tested Ashcroft and Mercoid pressure switches using compressed air/nitrogen and a multi-meter.

Dec. 1998-Jan. 1999 The BECO Group, Park Ridge, IL Maintenance Technician
Operated 2 Clever Brooks 150psi 400hp fire tube boilers and performed boiler/feedwater tests to ensure proper
water chemistry.


June 1998-Nov. 1998 Benchmark Technical, Schaumburg, IL Maintenance Technician
Performed preventive and corrective maintenance on automatic and manual shrink-wrap machines, electric glue
guns and ovens.

May 1998-June 1998 The BECO Group, Park Ridge, IL Inspector
Evaluated the performance for a new medical tubing machine by measuring the I.D. of the tubes using a digital micrometers.

Jan. 1996-Oct. 1997 USS Tarawa (LHA-1), USN, San Diego, CA Boiler Technician/Machinist Mate
Operated and maintained 600psi modified D-type water tube boiler with integral economizer, superheater and
desuperheater. Inspected and adjusted Dearating Feed Tank spray nozzles to insure proper operation. Operated
and maintained two steam-driven single-stage main feed pump with a single Rateau stage turbine. Operated and
maintained three double-screw low pitch rotary fuel oil pumps. Responsible for the complete repair, overhaul and hydrostatic testing of 8 bottom blow valves. Replace various high pressure orifice kits.


License
Current City of Chicago Stationary Engineer License

Education

Jan. 1991-June 1991
Steam Propulsion Maintenance Supervisor

July 1987-Jan. 1988
Propulsion Engineering Basics
Boiler Technician ‘A’ School
BT 6YO Advance Operator Phase 2
BT 6YO Advance Operator Phase 3
Junior Petty Officer Leadership Management

Awards
Air Force Good Conduct Medal
Armed Forces Expeditionary Medal
Navy Achievement Medal
Navy Good Conduct Medal (2)
National Defense Service Medal
Southwest Asia Service Medal with Bronze Star


Computer Skills
Microsoft Word 2003
Microsoft Office 2003
Internet Research





Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

BEFORE YOU REPLY - THIS BOARD IS NOT TO BE USED TO POST YOUR INTEREST IN A POSITION - ANY POSTINGS OF THIS TYPE WILL BE REMOVED. IF YOU ARE INTERESTED IN A JOB CONTACT THE COMPANY DIRECTLY. THE REPLY IS FOR USE OF THE COMPANY THAT MADE THE ORIGINAL AD ONLY TO POST CORRECTIONS.


[ Follow Ups ] [ Post Followup ] [ Resume Board Main Page ] [ FAQ ]