[an error occurred while processing this directive]

Winnipeg DOL


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 4 ] [ FAQ ]

Posted by Dave on July 04, 2010 at 12:38:02:

Has anyone ever had the dis-satisfaction of working with the Department of Labour in Manitoba. These guys seem so hung up on old school technology that they are slowing down any boiler upgrades or replacements just to satisfy the operating engineers. No offense to the operators, they are knowledgable and I have alot of respect for them. However times have changed and low water volume boilers that do not need an engineer are the way of the future. There are so many retros/replacements being done right now and they are halting all of them even though the boilers are already on site and some even installed. Its funny, there are already many of these installed and operating for years and now (10 years later) they change their mind. Any opinions would be gladly recieved. Just driving me nuts


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 4 ] [ FAQ ]