Re: POWER PIPING CODE


[ Follow Ups ] [ Post Followup ] [ Boilerroom.com Steam-Forum - Number 3 ] [ FAQ ]

Posted by mark on February 10, 2005 at 09:15:13:

In Reply to: Re: POWER PIPING CODE posted by Tony Conner on February 09, 2005 at 18:45:12:

: "Spud" is not a term I'm familiar with. Is it a case of, for example, having a piece of 6" pipe 8 feet long between a pair of 90*s, and needing it to be 12 feet, so you weld in 4 feet of straight 6" pipe?

exactly, we have a 6" pipe between two points that needs to be 3" longer. can a 3" piece be welded in or does the added piece (by code) need to be longer than the dia of the pipe? Thanks