Posted by asdasd on March 11, 2001 at 18:43:33:
In Reply to: Boiler System Design posted by Anish on August 30, 2000 at 23:27:47:
: Incase of High Pressure Boiler Installation it is suggested to have a suction head of 1 kg per cm.sq this results in the de-aerator and feed water tank being installed at the heigt of 10 mts.
: I wud like to know that why it is essential to have this arrangement ?
: Anish
yeah right
: yeah right