NEW Watertube Boiler Inquiry Sheet


Request quotations on NEW watertube boilers.

Click here for a sample watertube boiler specification.



Requesting a proposal is as easy as 1,2,3 !

1) POINT OF CONTACT INFORMATION:

Your Name: Required

Your Company:

Your E-Mail Address: Required

Your Phone Number: Required

Your FAX Number:

Your Mailing Address:


2) BOILER SELECTION INFORMATION:

Project Type:
This is a firm-bid project - purchase order within 1 month.
In specification stage right now, order within 6 months.
We only require preliminary/conceptual pricing at this time.


Boiler Capacity: (lbs/hr)

Boiler Operating Pressure (PSIG):

Steam Temperature:
Saturated
Superheated (PPH)
* If Superheat the temperature


PRIMARY AND STANDBY FUELS REQUESTED:
Propane
Natural Gas
#2 Fuel Oil
#4 Fuel Oil
#6 Fuel Oil
Other:


3) OPTIONAL ACCESSORY EQUIPMENT INFORMATION:

Other Optional Equipment to Include:
Click Here to Select a Boiler Feedwater System
Click Here to Select a Boiler Economizer

General Auxiliaries To Include:
Duplex Water Softener
Chemical Treatment Equipment
Blowdown Separator
Double Wall Stack - Height Required (feet):

COMPLETE CONTAINERIZED STEAM PLANT:
The Boiler Room can supply a complete steam plant manufactured in an a shipping container. All equipment required for boiler operation can be mounted, wired, and all piping run to allow for a fast and easy site installation. The container will be modified to accomodate lights, fresh air louvers, and a stub stack. Typical site installation requirements are: steam line from boiler to plant, boiler make-up water or condensate return to trailer, electric utility to trailer, natural gas line or fuel oil line to box.

Any additional information


New Equipment Sales Main Page

The Boiler Room Home Page

Information on The Boiler Room