Click here for a sample watertube boiler specification.
Requesting a proposal is as easy as 1,2,3 !
1) POINT OF CONTACT INFORMATION:
Your Phone Number:Required
Your FAX Number:
Your Mailing Address:
2) BOILER SELECTION INFORMATION:
Project Type:
This is a firm-bid project - purchase order within 1 month.
In specification stage right now, order within 6 months.
We only require preliminary/conceptual pricing at this time.
Boiler Capacity: (lbs/hr)
Boiler Operating Pressure (PSIG):
Steam Temperature:
Saturated
Superheated (PPH)
* If Superheat the temperature
PRIMARY AND STANDBY FUELS REQUESTED:
Propane
Natural Gas
#2 Fuel Oil
#4 Fuel Oil
#6 Fuel Oil
Other:
General Auxiliaries To Include:
Duplex Water Softener
Chemical Treatment Equipment
Blowdown Separator
Double Wall Stack - Height Required (feet):
COMPLETE CONTAINERIZED STEAM PLANT: The Boiler Room can supply a complete steam plant manufactured in an a shipping
container. All equipment required for boiler operation can be mounted, wired, and all piping
run to allow for a fast and easy site installation. The container will be modified to accomodate
lights, fresh air louvers, and a stub stack. Typical site installation requirements are: steam line
from boiler to plant, boiler make-up water or condensate return to trailer, electric utility
to trailer, natural gas line or fuel oil line to box.